Loading
Project Spec & Review

Punggol Point Cove (Sep)

Project

Project NamePunggol Point Cove (Sep)
Sales LaunchSep 2019 BTO
Project TypeBuild-To-Order (BTO)
Address/Location

Along the eastern shoreline of Punggol Point District

No of Blocks6
Total Units1179
Highest Floor26
Est. TOP Date2024-01-01
Tenure Length99 years
DeveloperHDB
Brochure & Floorplan Download
Telegram Join Group
Punggol Point Cove (Sep)
Loading

Overview

Punggol Point Cove Phase 2 is located along the eastern shoreline of Punggol Point District.

This development will comprise 6 residential blocks with staggered heights from 8 to 26 storeys. You can choose from 1,179 units of 2-room Flexi, 3-, 4-, and 5-room flats.

In terms of pricing, excluding grants, 2-room Flexi from $109K, 3-room from $205K, 4-room from $287K and 5-room from $423K.

This development's name is inspired by its waterfront location. Drawing reference from Punggol's humble beginnings as a fishing village, and later as a fishing port, the unique wave-like structure of the residential blocks are inspired by the free-flowing pattern of waves and interwoven fishing nets. In recognition of Punggol's rustic village past, most blocks will have their own courtyards and will be linked to other blocks by sky bridges at the 10th storey.

Sky terraces and roof gardens in some blocks wills serve as communal spaces for you to mingle with your family and neighbours while enjoying views of the surroundings. Fitness stations and playgrounds at the landscaped decks will provide additional recreation options. A childcare centre and a Residents' Committee Centre will also be located within the development.


Nearby Primary School Nearby Secondary School
Punggol Cove Primary School Yusof Ishak Secondary School
Oasis Primary School Punggol Secondary School

Accessibility: ⭐⭐

Amenities:⭐⭐

Affordability: ⭐⭐⭐⭐

Loading

Interior Design Ideas

#Scandinavian
#Scandinavian
#Contemporary #Minimalist
#Contemporary #Minimalist
#Contemporary #Traditional
#Contemporary #Traditional
#Contemporary
#Contemporary

TOP Progress

Estimated Date: 2024-01-01
29% Complete
View More

Development Progress Gallery

  • Punggol Point Cove (Sep) 2020-11-29
    2020-11-29
View More

Selected Units

ProjectFlat TypeBlock NoUnit NoSizeDate Selected
Loading

Map Location

Loading...Loading...