Warning: Data might not be accurate, always check HDB's website for the most up to date information.

Bedok Beacon Project Spec & Review Discussion Group Sales Launch Development Progress

Bedok-Beacon
Sales Launch Nov 2016 BTO
Project Name Bedok Beacon
Project Type Build-To-Order (BTO)
Address/Location Bounded by Bedok North Drive, Bedok North Avenue 1 and New Upper Changi Road
No of Blocks 3
Total Units 500
Highest Floor 17
Estimated T.O.P 2021-06-01
Tenture Length 99 years
Developer HDB
Neighbourhood Guide
Nearest Convenience Store Cheers at Bedok Mall
Nearest Petrol Station Esso at 799 Bedok South Ave 1
Nearest ATM DBS at 315 New Upper Changi Rd
Nearest AXS Machine Bedok MRT Station
Nearest Gym Anytime Fitness at 204 Bedok North Street 1
Nearest Police Post Bedok South Neighbourhood Police Centre
Nearest Clinic Raffles Medical at Bedok Mall
Nearest Hospital Changi General Hospital

Disclaimer
  1. Readers are advised to use information available here as study guide and use it at your own risk.
  2. Please note that changes/update based on available information will be made from time to time, readers are advised to check on this page regularly.
  3. Analysis was done based on available data at the time of publishing of this review.
  4. As each and every unit has it's own attributes, analysis shown here only represent the majority units in the stacks having the same attribute including sun, wind, view, distance etc.

Review

Bedok Beacon is approximately 3 minutes (300m) walk away from Bedok MRT Station.

In terms of pricing, excluding grants, 2-room Flexi from $135K and 4-room from $407K.

This development consists of 500 units of 2-room Flexi and 4-room flats.

Nearby Primary Schools:

  • Opera Estate Primary (670m)
  • Fengshan Primary (800m)

Nearby Secondary Schools:

  • Ping Yi Secondary (810m)

The nearest groceries stores are located at:

  • NTUC at Bedok Mall(190m)


Accessibility:

Amenities:

Affordability:


Analysis

 

Selected Units

Project Flat Type Block No Unit No Date Selected
Project Flat Type Block No Unit No Date Selected

Estimated T.O.P Progress (2021-06-01)

47% Complete
View More

Location Map